ADVERTISEMENT

ADVERTISEMENT FOR BIDS Notice is hereby

ADVERTISEMENT FOR BIDS Notice is hereby given that sealed proposals will be received by Worthington Public Utilities, located at 318 Ninth Street, P.O. Box 458, Worthington, MN 56187-0458, until 2:00 PM CST, on March 29, 2022, for construction of the new Substation No. 3 for Worthington Public Utilities, Worthington, Minnesota. At said time and place, proposals will be publicly opened and read aloud. The general nature of the work is described as substation construction that includes new circuit breaker, power transformer, shield mast, buswork, switchgear enclosure, cap banks, and control panels. Construction items include the concrete, switchgear enclosure construction, conduit, grounding, buswork, circuit breaker installation, cap bank installation, power and control cabling, and related work. The above work shall be in accordance with the specifications and proposed form of contract now on file in Worthington Public Utilities offices in said city of Worthington, Minnesota, by this reference made a part hereof, as though fully set out and incorporated herein. The Contractor and all subcontractors shall submit to the Owner a signed statement verifying compliance with each of the criteria described in the State of Minnesota “Responsible Contractor” law as codified in Minnesota Statute section 16C.285. See the Instructions to Bidders for more details. Contractors desiring a copy of the project documents for individual use may obtain them from www.questcdn.com. You may download the digital plan documents for $20 by inputting Quest project #8137022 on the website’s Project Search page. Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with this digital project information. An optional paper set of the proposal forms and specifications for individual use may be obtained from the office of the Engineer, DGR Engineering, 1302 South Union Street, P.O. Box 511, Rock Rapids, IA 51246, telephone 712-472-2531, Fax 712-472-2710, e-mail dgr@dgr.com, upon payment of $150.00, none of which is refundable. All bids shall be made on proposal forms furnished by the Engineer and shall be accompanied by bid security in the form of a certified check or bid bond, made payable to Worthington Public Utilities, in the amount of ten percent (10%) of the bid, which security becomes the property of Worthington Public Utilities in the event the successful bidder fails to enter into a contract and post satisfactory performance and payment bonds. Payment to the Contractor will be made on the basis of ninety percent (95%) upon certification of work completed; five percent (5%) within thirty-one (31) days after final completion and acceptance. The construction shall be performed upon a Notice to Proceed issuance. Substantial completion of the project shall be no later than November 30, 2022. See the specifications for more details on construction timing requirements. Worthington Public Utilities reserves the right to defer acceptance of any bid for a period not to exceed thirty (30) days after the date bids are received and no bid may be withdrawn during this period. Worthington Public Utilities also reserves the right to reject any or all bids and enter into such contract as it shall deem to be in the best interest of Worthington Public Utilities. WORTHINGTON PUBLIC UTILITIES By /s/ Scott Hain General Manager (March 2, 2022) 37710