ADVERTISEMENT

SECTION 00 11 13 ADVERTISEMENT FOR BIDS WORTHINGTON MIDDLE SCHOOL 2019 PAVING: PHASE 1 1401 North Crailsheim Road Worthington, Minnesota Independent School District #518 will receive single prime sealed bids for Worthington Middle School 2019 Paving: Phase I until 10:00 a.

SECTION 00 11 13

ADVERTISEMENT FOR BIDS

WORTHINGTON MIDDLE SCHOOL 2019 PAVING: PHASE 1
1401 North Crailsheim Road
Worthington, Minnesota


Independent School District #518 will receive single prime sealed bids for Worthington Middle School 2019 Paving: Phase I until 10:00 a.m. local time on September 17, 2019 at the District Office, 1117 Marine Avenue, Worthington, Minnesota 56187, at which time and place all bids will be publicly opened and read aloud. Absolutely no bids will be accepted after 10:00 a.m.

This project includes: Soil corrections, rough and finish regrading.

Bidding Documents are available for Download to prospective bidders and subcontractors by contacting the Owner's Representative, ICS Consulting, Inc., 3890 Pheasant Ridge Drive NE, Suite #180, Blaine, Minnesota 55449, (763) 354-2670. Prospective Bidders and Subcontractors will be given instructions to download complete sets of the bidding documents. The downloads will be made available August 27, 2019.

Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, Minnesota Responsible Contractor Compliance Affidavit, as well as a certified check or acceptable bidder's bond payable to Independent School District #518 in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond.

Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding.

The Owner requires Substantial Completion of the project on or before November 1, 2019.
Board of Education

INDEPENDENT SCHOOL DISTRICT #518
(August 31, 2019)